Ana səhifəProjectsFinished projectsGobustan city water supply and sewage systems

The project of reconstruction of water supply and sewage systems of the city of Gobustan, Republic of Azerbaijan
















Reservoirs area: Construction of 4 concrete reservoirs, including a storage chamber and a chlorinator building; Installation of PLC/SCADA system; high-voltage power line construction, transformer installation, etc. electrical works; fencing of the water reservoir area, construction of a watchman's building and improvement of the area.


Main water line: Laying of main water line from HDPE pipe (PN 10&16); construction of Tasi-Badalli main water line from steel pipe; construction of linear drawers, air suction cups and evacuation chambers, etc.


Artesian wells: Drilling of 6 deep artesian wells including construction of well houses, tube chamber, installation of PLC system, pumps and 1000kv transformer and generator, etc.


Water treatment plant: Construction of reverse osmosis type water treatment plant including piping, installation of PLC system and electrical works


Water network: drawing of the urban network from DN 90-315 mm PN 10 PE pipe; installation of linear drawer, water hydrant and mechanical water meters.


Sewerage network: construction of urban sewerage network and collector from DN 200-600mm CHDPE pipe; Construction of DN 800-1200 mm road pipe crossings, installation of DN 800, 1000 and 1500 mm sewage and house connection wells


Water pumping station: Reconstruction of paid pumping station. Replacement of pumps, installation of PLC/ SCADA system and construction of 10kV 630A substation.


Road works:

Re-asphalting of inner city roads 92 000 m2

Earthworks of the road 18 400 m3


Description of the main works within the project:

Total earthworks - 562 450 m3

Total concrete works - 7386 m3

Total pipeline works - 97,283 m

Total iron works - 1477 tons

General electrical works - 20,000 meters

Where Innovation Intersects Infrastructure!