







Fixing by anchor injection and tarcreting method to increase stability on slopes
Construction of an underpass designed for vehicles along the road -1 unit
Construction of retaining wall - 180 m
Construction of culvert structure - 3 units
Earthworks and road bed construction km 41+057-46+000
Total land volumes
Excavation and transportation of soil - 2,500,000.00 m3
Forming with filling material - 960,000.00 m3