







"Fuzuli Airport: Excavation works for runways, aprons, and internal roads; construction of the roadbed.
Fuzuli-Hadrut Highway: Excavation and roadbed construction for a 12 km long highway.
Construction of Water Transmission Structures:
Bridge Construction: Construction of a single-span bridge at the 9th km of the road, including piling works and concrete structure of the bridge – 1 unit.
Pile Static and Integrity Tests"