Ana səhifəProjectsFinished projectsReconstruction of oil refinery named after Heydar Aliyev

Reconstruction of oil refinery named after Heydar Aliyev


Excavation and soil filling works, construction of DN 1000 mm and 1200 mm sewage-drainage pipelines, DN 650 mm pile works, DN 2000-DN 1400 mm concrete tunnel works, etc.


Description of the main works within the project:

Drilling and filling works 250 000 m3

Pile works 71 pieces x 15.5 m (diameter 1200 mm)

Sewer line - 1500 meters (dn 1500 mm)

Microtunnel line - 350 m

Driving metal piles - 1700 m

Static and integrity tests of piles

Where Innovation Intersects Infrastructure!