"General Description of Work within the Project:
Pile Works Under the Bridge Foundations
Construction of Concrete Structure Bridge
Detailed Description of Main Works:
Total Concrete Works: 3132 m³
Total Reinforcement Works: 626.4 tons
Railing: 317 m"