Works Performed:
Excavation and roadbed construction for a 12 km long highway on the Fuzuli-Hadrut Highway.
Construction of water transmission structures – 14 units (in various sizes, total length – 622 meters).
Construction of a single-span bridge at the 9th km of the road, including piling works and concrete structure of the bridge – 1 unit.
Static and integrity tests of the piles.